# Were the agency buildings both underpinned and painted after the agent took charge?

**Finding 3369 — No. The agent said authorization for underpinning was obtained and that work and rock-and-cement walling were completed before winter.**

He explicitly said the buildings had not yet been painted and hoped authorization would follow. This is a separation of completed foundation work from a future finish; no procurement or final inspection is supplied.

**Source and method.** Hal J. Cole, “Report of Colville Agency,” August 11, 1890, *Annual Report of the Commissioner of Indian Affairs for 1890*, printed p. 219; [DOI original scan, PDF leaf 205](https://www.doi.gov/sites/default/files/T-21922.pdf#page=205).  The Colville report begins beneath the Utah agent’s signature on p. 216 and ends above Neah Bay on p. 222; this reads the scan against imperfect OCR, preserving the difference between an agent’s retrospective account, a forecast, an authorization and independently proved outcome.