# Had a replacement Warm Springs sawmill been erected after the dam washout?

**Finding 3334 — No such completion appears. Low water curtailed sawing, winter high water carried away the dam, and the agent said a new mill was needed.**

The damaged existing mill could not resume sawing until late spring, according to the report. A need or request for an entirely new mill is not a construction contract, an installed machine, or evidence that replacement was operating.

**Source and method.** “Report of Warm Springs Agency,” August 23, 1890, *Annual Report of the Commissioner of Indian Affairs for 1890*, printed p. 213; [DOI original scan, PDF leaf 202](https://www.doi.gov/sites/default/files/T-21922.pdf#page=202). The Warm Springs report starts after Umatilla on p. 210 and ends before Uintah on p. 214. This finding reads the original page image against OCR and treats the agent’s account as a report, not independent verification.