# Did Plumb report that a water-storage reservoir had been built?

**Finding 3133 — No. He reported Indigenous construction of a ditch and extension, but requested a cost survey for storing spring runoff that streams lacked in July and August.**

He described the main ditch as three feet wide at the bottom and twelve at the top, then narrowed its extension, and said residents did the work with his help. Length glyphs in the scan are ambiguous and are not used here. A built conveyance ditch is not a completed reservoir, and the cost-survey request is not construction authorization or proof of future irrigation yield.

**Source and method.** Plumb, Western Shoshone report, printed p. 151, [PDF leaf 171](https://www.doi.gov/sites/default/files/T-21922.pdf#page=171). Construction is separated from proposed storage; unclear fractional mile figures are deliberately omitted.
