# Were the Choteau Creek bridges rebuilt with $2,500 in 1890?

**Finding 2901 — lost bridges and a requested appropriation, not a construction record.** At the end of his Yankton Agency report, **E. W. Foster** recommended “an appropriation of **$2,500**” to build bridges across **Choteau Creek** on main roads to towns in **Bon Homme County**. He said bridges there had been swept away by floods “some years ago.” This establishes the agent’s retrospective account of damaged crossings and his 1890 funding request, not that Congress appropriated the money or that replacement bridges were built.

The printed recommendation gives no number of bridge sites, engineering survey, contractor, expenditure voucher, construction date, inspection, or later status. Its reference to floods is Foster’s explanation, not an independently dated flood record. A separate nearby proposal for a telephone link to a railroad town about 30 miles away should not be mistaken for a bridge-route distance or an already built line.

**Source and method.** E. W. Foster, “Report of Yankton Agency,” *Annual Report of the Commissioner of Indian Affairs for 1890*, [printed p. 73, PDF leaf 132, recommendations](https://www.doi.gov/sites/default/files/T-21922.pdf#page=132). I inspected the enlarged page scan for the dollar amount, creek, county, and proposal wording.
