# Which Yankton Agency buildings were actually completed by mid-1890?

**Finding 2896 — several projects, different stages.** Agent **E. W. Foster** said construction of **three employee cottages and an agent’s dwelling** was authorized and began after his arrival in April 1890. Incomplete plans, insufficient materials, difficulty keeping workers and obtaining mechanics, and competing work prevented completion **by June 30**. Cottages intended for the clerk, physician, and shop superintendent were **nearly ready for occupancy**; the agent’s dwelling needed substantially more time. “Authorized” and “nearly ready” are not proof of occupancy or completion.

Foster described a **different, older school building** as unsafe. After school closed, repairs were authorized and started: the old foundation had been removed and a **24-inch wall** placed under the building; work was still being pushed forward. That was **not the new girls’ school building**. He said the latter had been **completed June 1**, but criticized its interior design because Professor Rich’s heating and ventilating plans had not been incorporated during construction. **Temporary heating appliances might be needed in winter**—a forecast, not evidence they were installed or that the completed building had adequate heat. Foster also said old cottonwood shops, flour and sawmills, and other buildings remained unimproved; this does not alter the separate status of the cottages and schools.

The passage gives no construction vouchers, inspection certificate, later occupancy date, heating-installation record, or pupils’ measured health outcome. Its milestone dates are the agent’s reported dates, not proof of final acceptance of every structure.

**Source and method.** E. W. Foster, “Report of Yankton Agency,” *Annual Report of the Commissioner of Indian Affairs for 1890*, [printed p. 71, PDF leaf 131, “Agency Buildings” and “School Buildings”](https://www.doi.gov/sites/default/files/T-21922.pdf#page=131), continuing [printed p. 72, PDF leaf 132](https://www.doi.gov/sites/default/files/T-21922.pdf#page=132). I checked the separate building passages and signature against the scanned pages, correcting OCR noise in the foundation measurement and June dates.