# Had Cheyenne River day school No. 8 already moved from Plum Creek to Cherry Creek in 1890?

**Finding 2847 — No: the agent described an existing school on ceded land and recommended a *new* one on the diminished reserve.** The Cheyenne River agent located **No. 8 day school** on **ceded land about 60 miles west of the agency, three miles above the mouth of Plum Creek**. He said most Indigenous families near the school had moved to the new reserve and that too few children remained near the existing building to justify its continuation. He recommended that **a new No. 8 day school be built on Cherry Creek**, which he described as flowing north into the Cheyenne River directly opposite Plum Creek. He said many families formerly at Plum Creek had moved there and that enough school-age children lived near Cherry Creek to warrant the expenditure.

The existing Plum Creek school was **not already closed** in the report: it had held **ten months of sessions** in the reporting year and recorded **21.7 average attendance**. The agent specifically judged it inadvisable to **move the building** from Plum Creek because of rough terrain. Thus a proposed **new building across the river** should not be recast as a completed physical relocation of the old building, an established replacement school, or proof that every family had moved. The report offers the agent’s account of family moves and location, not household-by-household testimony, a land-title record, or subsequent construction documentation.

In the same report the agent recommended **three new day schools** on the diminished reserve to accommodate population moves from ceded lands. This is a recommendation, not a statement that three were funded, built, staffed, or open.

**Source and method.** Cheyenne River agency report dated August 25, 1890, *Annual Report of the Commissioner of Indian Affairs for 1890*, [printed p. 44, PDF leaf 118](https://www.doi.gov/sites/default/files/T-21922.pdf#page=118), “No. 8 Day School” and concluding school recommendation. I visually inspected the scan for the ceded-land and creek descriptions, the ten-month and 21.7 figures, and the recommendation not to move the existing building. No later inspection report or building contract is included in this passage.
