# 2739. Did an urgent 1890 Indian-supply delivery bypass inspection without a price consequence?

**Finding.** No blanket bypass appears in the Commissioner's stated procedure. An expert inspector compared delivered goods with the samples used for awards **after delivery but before acceptance and shipment**. Goods matching the sample were accepted and shipped. Those that did not match were ordinarily **rejected**; the contractor had to furnish conforming goods, or replacements were bought on the open market at the contractor's expense, with any difference in cost charged against him. The report also specifies a narrower, conditional route for accepting a deviation: immediate service need, a **nonmaterial** departure from the sample, and a deduction from the contractor's account of **twice the difference in value fixed by the inspector**. That is a doubled *value difference*, not a deduction of twice the entire contract price.

The [1890 annual report, printed p. CXXII, PDF leaf 65](https://www.doi.gov/sites/default/files/T-21922.pdf#page=65), explains that the relevant contract clause permitted goods “not quite up to the sample” when immediate deliveries were needed and the deviation was not material. The inspector fixed the difference between sample and award goods; “a deduction of twice the amount fixed by the inspector as the difference in value is made from the account.” The Commissioner says inferior goods were accepted in **“very few cases,”** and only when needed for immediate use and otherwise unobtainable. This describes the Office's reported policy and frequency, not a list of particular inferior shipments, a valuation schedule, or independently verified enforcement in every contract. It does not establish that a named contractor was penalized or that every agency received only conforming merchandise.

A second control was documentary rather than a separate count of purchased goods. **For every shipment**, the contractor made **four invoices**: the original went to the Treasury **for payment**, one remained in the Indian Office, one was mailed to the agent or school superintendent, and the fourth accompanied the bill of lading so freight could be identified when payment for transportation was made. The Commissioner says **over 30,000 invoices were required for the fiscal year ended June 30, 1890**. That is the report's invoice workload, not a count of 30,000 contracts, bids, paid Treasury vouchers, or packages. The neighboring [shipment tally on printed p. CXXI](https://www.doi.gov/sites/default/files/T-21922.pdf#page=64) counts 80,407 packages from New York and western points; no package-to-invoice or shipment-to-invoice register is supplied here to reconcile the two numbers. An invoice sent *for* payment is not proof that the Treasury paid it or that the recipient signed for delivery.

**Boundary of the answer.** The printed report provides the sequence, exception, prescribed deduction, and routing of invoice copies. Actual sample comparisons, inspector valuations, exceptions granted, replacement purchases, deductions posted, freight payments, and consignee receipts would require the underlying contracts, inspection reports, invoices, bills of lading, shipment registers, and accounts. Their absence from this summary must not be converted into an allegation of evasion or proof of universal compliance.

**Source:** Commissioner of Indian Affairs, *Annual Report* (1890), [printed p. CXXII, PDF leaf 65](https://www.doi.gov/sites/default/files/T-21922.pdf#page=65), inspection and invoice paragraphs, checked against the scanned page image; [printed p. CXXI, PDF leaf 64](https://www.doi.gov/sites/default/files/T-21922.pdf#page=64), shipment totals.