# 2694. Lac du Flambeau: a treaty's railroad clause was not enough; $1,638.54 reached Treasury after a new grant

**Question.** Did the 1854 Chippewa treaty itself authorize the Milwaukee, Lake Shore and Western Railway to build across the Lac du Flambeau Reservation? And what happened to the compensation after Congress supplied a right-of-way act?

**Finding.** Article III of the **September 30, 1854 treaty** says necessary roads, highways, and railroads may have rights of way through reserved tracts, **“compensation being made therefor as in other cases.”** The Indian Office authorized **preliminary surveys on November 20, 1887**, expressly not construction. Its 1888 report says that on **April 26, 1888** the Interior Department decided this treaty language was **insufficient for the Department to grant construction authority**: the company needed Congress. Congress enacted the **June 4, 1888 act, 25 Stat. 169**. The Department approved a definite-location map **July 30**, and a presidential order of **August 1** prescribed a process for obtaining Indian consent; as of the 1888 report, consent in regular form **had not yet been secured**.

The **1889** Commissioner reports a changed status: the Lac du Flambeau Indians had **assented to the act's provisions and agreed to a compensation amount**; the Department fixed it at **$1,638.54 on May 3, 1889**; the money **was collected from the railroad and placed in the Treasury to the Commissioner's credit**. Agent **M. A. Leahy**, reporting **September 16, 1889**, says the railroad had been graded across the reservation “during the past summer,” and tribal right-of-way damages had been paid **to the Government for the Indians' use**. He **recommended** investing the money in flour and pork for later issue, not that such purchases or distribution had already occurred.

**The statutory gate.** Section 1 of the 1888 act granted a strip **50 feet on each side** of the line and up to **two** station grounds, each no more than **300 by 3,000 feet**, as well as construction materials from adjacent lands. Section 2 required the Secretary to fix compensation for the tribal right of way **and ascertain individual members' construction damages**. No right in the corridor vested until actual-survey plats including station grounds were approved, compensation was **fixed and paid**, and Indian consent **to the amount** was first obtained in a manner satisfactory to the President. A proviso allowed a different presidentially directed compensation determination if the Indians refused an amount the President judged just, followed by payment as the Secretary directed; consequently the act is **not accurately described as an unconditional tribal veto**. Survey entry was separately permitted. Section 3 imposed a **three-year construction condition**; the report of grading is not a complete engineering record of timely completion.

**What the evidence does not show.** The 1888 report's approved *definite-location map* does not expressly establish that **all station plats** had been approved. The Commissioner's 1889 statement establishes **reported collection and Treasury placement**, not an independently recovered company receipt, individual-damage schedule, tribal distribution roll, expenditure voucher, or proof that Leahy's food recommendation was adopted. Nor does the agent's “graded” mean the entire road was opened to trains. The earlier absence of formal consent must not be carried forward past the 1889 assent report; conversely, a Treasury credit must not be rewritten as cash delivered to every person. The printed reports do not independently demonstrate that every section 2 prerequisite vested on a particular date.

**Why it matters.** A treaty that names *railroads* can look like an immediately executable private grant, and an annual report that calls damages “paid” can look like direct payment to beneficiaries. The Department's contemporaneous ruling and Congress's subsequent conditional statute defeat the first shortcut; the precise Treasury custody language defeats the second. This is the **Milwaukee, Lake Shore and Western at Lac du Flambeau**, not the separate **Duluth and Winnipeg at Fond du Lac** or Bad River railroad accounts.

**Primary sources.**

1. [1854 treaty, 10 Stat. 1109–10, art. III](https://www.govinfo.gov/content/pkg/STATUTE-10/pdf/STATUTE-10-Pg1109.pdf), printed p. 1110: railroads/right-of-way/compensation clause.
2. Commissioner of Indian Affairs, *Annual Report* (1888), printed pp. **xlviii–xlix**, [DOI scan, PDF leaf 27](https://www.doi.gov/sites/default/files/T-21920.pdf#page=27): November 1887 limited survey authority, April 1888 departmental ruling, June statute, July map approval, August consent order, no regular consent yet.
3. [Act of June 4, 1888, 25 Stat. 169](https://www.govinfo.gov/content/pkg/STATUTE-25/pdf/STATUTE-25-Pg169.pdf), §§1–4: corridor, station dimensions, compensation and consent conditions, refusal proviso, survey entry, construction period.
4. Commissioner of Indian Affairs, *Annual Report* (1889), printed p. **40**, [Internet Archive scan, PDF leaf 50](https://archive.org/download/annualreportofco188900unitrich/annualreportofco188900unitrich.pdf#page=50): assent, May 3 determination, $1,638.54 collection and Treasury credit.
5. Agent M. A. Leahy, *Annual Report* (September 16, 1889), printed p. **305**, [same volume, PDF leaf 315](https://archive.org/download/annualreportofco188900unitrich/annualreportofco188900unitrich.pdf#page=315): grading, payment to government, proposed flour-and-pork use.

**Open record.** Locate the original consent proceedings and presidential determination, approved location and station plats, assessment of individual damages, railroad remittance and Treasury account, any subsequent disbursement or purchase, and construction-completion records. The annual reports identify these as records to seek, not evidence of a missing payment or unlawful route.
