# 2683. Five Crow railway maps were filed; three came back with objections, and station plats were missing

**Question.** Did filing route maps and receiving a Crow agent’s favorable report mean the Big Horn Southern Railroad Company had an approved right of way across the Crow reservation by 1890?

**Finding.** The Commissioner of Indian Affairs reported that **five definite-location maps** for Big Horn Southern were filed and sent to the Crow Agency for examination, including whether the proposed line would harm individual Indian holdings. The agent said he knew of **no objection**. Nevertheless, **three maps—the first, second and third—were returned to the Indian Office on January 25, 1890, with objections to approval**, and the company’s president was sent those objections on **April 19, 1890**. The company was also told to file **separate station-ground plats**, which, the Commissioner says, had **not yet been done**. A favorable agent report and submission of five maps therefore do not establish the Secretary’s written approval of all five, much less an approved complete route and stations. The text does not specify the objections or establish whether the other two maps were approved, rejected, or pending.

The governing **February 12, 1889** act, **25 Stat. 660–661**, describes a route from near the mouth of the Big Horn River toward the Little Big Horn and Owl Creek, grants a corridor **75 feet each side of the centerline**, and authorizes station lands within limits. Section 3 makes the Secretary responsible for determining compensation for the Crow Indians’ right of way and individual members’ construction damages. It provides that **no right of way vests until actually surveyed definite-location plats including station points are filed and approved by the Secretary in writing, and compensation has been fixed and paid**. Section 6 independently lets the company survey and locate immediately; that preliminary authority is not the same as a vested, paid-for right or proof of construction. Section 3 allows the **President, in his discretion**, to require Indian consent by a prescribed procedure before any right accrues. The statute does **not** say that consent was automatically required in every instance, and neither the map paragraph nor this finding establishes whether that discretion was exercised.

The act sets a two-year construction-and-operation limit from passage, or, **if Indigenous consent is required**, two years from the consent date. At the report’s 1890 status point, this is not proof of a later forfeiture. The Crow-reservation act should also not be conflated with the separate **February 23, 1889** act giving Big Horn Southern a route across **Fort Custer Military Reservation**; that is a different land jurisdiction and statutory instrument.

**Why this matters.** The archive captures a concrete administrative bottleneck: a railroad submitted five maps, but a local “no objection” recommendation did not resolve central objections to three and did not supply the missing station plats. Calling the entire route approved would erase the act’s written-approval and payment gates. Calling every map rejected, or concluding that the railroad never built, would exceed the report.

**Primary sources.**

1. Commissioner of Indian Affairs, *Annual Report* (1890), printed p. LXVI, “Crow Reserve, Montana,” [PDF leaf 37](https://www.doi.gov/sites/default/files/T-21922.pdf#page=37) (five maps, agent review, three returned, separate station plats absent).
2. Act of February 12, 1889, ch. 134, **25 Stat. 660–661**, [official PDF](https://www.govinfo.gov/content/pkg/STATUTE-25/pdf/STATUTE-25-Pg660.pdf), §§1–6 (route, width, compensation, approved plats, discretionary consent and survey entry). The distinct Fort Custer entry is indexed at **25 Stat. 690**.

**Evidence limit.** The original five maps and covering letters, the objections themselves, station plats, written Secretary approvals, compensation determinations and vouchers, any presidential consent directive, and subsequent construction or forfeiture records were not located here. Absence from this report is not proof that an action never occurred later.